Summary for Test 2024-10-31-25-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994378 DEA: 040K6304 EFIS: 0416000111 |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-29-16.4/19.0 |
| Award Date | 06/27/2023 |
| Closeout Date | Not set |
| Work Description | BRIDGE RAIL REPLACEMENT AND SHOULDER WIDENING. |
| Location Description | NAPA COUNTY NEAR YOUNTVILLE AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF DRY CREEK BRIDGE TO 0.1 MILE NORTH OF CALIFORNIA DRIVE UNDERCROSSIG |
| QA Service Level | 1 (Verified on 10/27/2022) |
Sample Information
| Sample Taken Date | 10/31/2024 | Sample Unique Key | 25 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/01/2024 |
| Sample type | Production Start-Up | A brief description of the sample | RAP 25%RAP |
| The quantity of what the sample constitutes | 2 Bags of Rap | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Nick | Last name of sampler or witnessed by | HALL |
| Title of sampler | Lab Technician | Telephone number of sampler | 7072999133 |
| Laboratory sample identification | Con_24_897 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Vulcan Vallejo Drier Drum Plant | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Vulcan materials |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2024-10-31-25
DIME Test ID: 2024-10-31-25-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-11-12
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Jacob Vega
Date of test: 11/01/2024
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1975.8 g
Mass Loss: 131.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.15 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 6.50 %
General comments (publicly viewable) (Max 1000 characters): Vulcan Vallejo Drier Drum Plant
Test was verified on 11/12/2024 ✔
