Summary for Test 2024-10-28-20-1

Test performed: ASTM C138-17a

Project Information

Project IdentifiersProject ID: 7612
DEA: 060N8504
EFIS: 0600020699
DIST-CO-RTE-PM06-TUL-99-23.5
Award Date10/12/2012
Closeout Date10/25/2013
Work DescriptionREPAIR BRIDGE.
Location DescriptionTULARE COUNTY IN TULARE AT AVENUE 184 OVERCROSSING
QA Service Level1 (Verified on 11/19/2012)

Sample Information

Sample Taken Date10/28/2024 Sample Unique Key20
Date that the sample was received by the laboratory/organization performing the testing10/29/2024 Sample typeQuality Control
A brief description of the sampleT-II/V Cement The quantity of what the sample constitutes5 CY
From where was the sample collectedManufacturer First name of sampler or witnessed byJimmy
Last name of sampler or witnessed byJuco Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCon-Fab California, LLC - Shafter
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSCC-S8.5-0FG
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected5197
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedSampled from wheelbarrow collected from chute of ready mix truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-10-28-20
DIME Test ID: 2024-10-28-20-1
Testing Lab: Con-Fab California Corporation - Shafter
Test Method: ASTM C138-17a: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2024-11-04

Test Results


Input Type: Calculated
Tester's full name: Jimmy Juco
Date of test: 10/28/2024
Identification of concrete represented by the sample: I Girder
Volume of the measure: 0.250 ft^3
Density of concrete: 154.8 lb/ft^3
Yield of concrete: no data
Relative yield of the batch: no data
Cement content: no data
Air content: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/4/2024 ✔