Summary for Test 2024-10-03-3-2
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 10/03/2024 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/03/2024 | Sample type | Aggregate Prequalification Program |
| A brief description of the sample | 1" agg natural | The quantity of what the sample constitutes | 10 Bags |
| From where was the sample collected | Source | First name of sampler or witnessed by | William |
| Last name of sampler or witnessed by | Lucas | Title of sampler | QC Supervisor |
| Telephone number of sampler | 661-9028196 | Laboratory sample identification | 1378434297 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Granite Construction - Big Rock | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0046 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 1" X #4 AGG NATURAL | The fabricator/manufacturer designation for the sample | |
| The plant number | A detailed description of where the material sample was collected | from a stock production pile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | 1785 |
Test Details
DIME Sample ID: 2024-10-03-3
DIME Test ID: 2024-10-03-3-2
Testing Lab: Granite Construction Company - Santa Paula
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2024-11-01
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: William Lucas
Date of test: 11/01/2024
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 98 % | ||||||
| 78 % | ||||||
| 29 % | ||||||
| 6 % | ||||||
| 2 % | ||||||
| 2 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/1/2024 ✔