Summary for Test 2024-10-23-39-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 993184
DEA: 040A7724
EFIS: 0420000288
COOP: 0422825
DIST-CO-RTE-PM04-ALA-80-6.4/6.8
Award DateNot set
Closeout DateNot set
Work DescriptionExcavation, HMA, structural concrete, minor concrete and drainage.
Location DescriptionIN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD
QA Service Level1 (Verified on 04/08/2022)

Sample Information

Sample Taken Date10/23/2024 Sample Unique Key39
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/23/2024
Sample typeQuality Assurance A brief description of the sample3 cilinders
The quantity of what the sample constitutes3 cilinders From where was the sample collectedJob Site
First name of sampler or witnessed byIGNACIO Last name of sampler or witnessed byARECHIGA
Title of sampler Telephone number of sampler5102077252
Laboratory sample identificationRich_24_140 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Vallejo Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-48-0002
The fabricator's/manufacturer's product name for the sampleClass 2 AB -Virgen The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedRoadway
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-10-23-39
DIME Test ID: 2024-10-23-39-1
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-10-25

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 10/23/2024
Sum of Count or Density: 78430 g/cc
Average of Count or Density: 26143 g/cc
Sum of Moisture Count: 5130 g/cc
Average of Moisture Count: 1710 g/cc
Count Ratio Density: 2.23
Count Ratio Moisture: 0.13
Calculated Percent Relative Compaction: 95.7 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): compaction test class 2 AB

Test was verified on 10/25/2024