Summary for Test 2024-08-27-116-7
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 993333 DEA: 04264724 EFIS: 0419000068 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-101-R20.8/27.1 |
| Award Date | 04/26/2022 |
| Closeout Date | Not set |
| Work Description | CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL. |
| Location Description | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
| Sample Taken Date | 08/27/2024 | Sample Unique Key | 116 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/27/2024 |
| Sample type | Quality Control | A brief description of the sample | aggregate |
| The quantity of what the sample constitutes | CY | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Roland | Last name of sampler or witnessed by | Ocansey |
| Title of sampler | Field Lab Technician | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Northgate Ready Mix | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Northgate Ready mix |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | supplier | |
| Where the material sample would have been placed if not sampled | shotcrete | Primary Aggregate Nominal Size | 3/8 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-08-27-116
DIME Test ID: 2024-08-27-116-7
Testing Lab: Pavement Engineers
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-10-22
Test Results
Number of tests: 3
Input Type: Calculated
Tester's full name: Roland Ocansey
Date of test: 08/27/2024
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.6
Sand reading (test 1): 3.5
Clay reading (test 2): 4.9
Sand reading (test 2): 3.8
Clay reading (test 3): 4.7
Sand reading (test 3): 3.6
Sand equivalent (test 1): 77
Sand equivalent (test 2): 78
Sand equivalent (test 3): 77
Sand equivalent before temperature correction: 78
Sand equivalent after temperature correction: 78
General comments (publicly viewable) (Max 1000 characters): concrete sand
Test was verified on 10/22/2024 ✔