Summary for Test 2024-09-29-6-6
Test performed: CTM 389-19Project Information
| Project Identifiers | Project ID: 994903 DEA: 11430244 EFIS: 1118000033 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-125-9.3/13.0 |
| Award Date | 09/06/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA, RHMA, SLAB REPLACEMENT, AND ELECTRICAL WORK. |
| Location Description | SAN DIEGO COUNTY IN AND NEAR LEMON GROVE FROM 0.3 MILE SOUTH OF ELKELTON PLACE UNDERCROSSING TO 0.2 MILE SOUTH OF ROUTE 125/94 SEPARATION |
| QA Service Level | 1 (Verified on 11/14/2023) |
Sample Information
| Sample Taken Date | 09/29/2024 | Sample Unique Key | 6 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/03/2024 |
| Sample type | Quality Assurance | A brief description of the sample | PSU |
| The quantity of what the sample constitutes | 12 boxes | From where was the sample collected | Source |
| First name of sampler or witnessed by | Ben | Last name of sampler or witnessed by | Smith |
| Title of sampler | Telephone number of sampler | 6193804522 | |
| Laboratory sample identification | 0132-PSU | Linked DIME Sample ID | 2024-09-29-7 |
| The fabricator/manufacturer/facility name | Vulcan Otay | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 320819 Otay Val | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-09-29-6
DIME Test ID: 2024-09-29-6-6
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt
Test Release Date: 2024-10-11
Test Results
Specified number of passes at 12.7 mm: 15000
Specimen Preparation Method:
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 10/09/2024
Test Temperature: 122 F
Compaction Method: SGC Cylindrical Specimen
Air Void Content for specimen A-1: no data
Air Void Content for specimen A-2: no data
Air Void Content for specimen B-1: no data
Air Void Content for specimen B-2: no data
Stripping Inflection Point (Wheel A): >15000
Stripping Inflection Point (Wheel B): >15000
Maximum impression at 5000 passes (left wheel): 1.65 mm
Maximum impression at 5000 passes (right wheel): 0.26 mm
Average impression at 5000 passes (left/right avg): 0.96 mm
Maximum impression at 10000 passes (left wheel): 1.98 mm
Maximum impression at 10000 passes (right wheel): 0.38 mm
Average impression at 10000 passes (left/right avg): 1.18 mm
Maximum impression at 15000 passes (left wheel): 2.2 mm
Maximum impression at 15000 passes (right wheel): 0.69 mm
Average impression at 15000 passes (left/right avg): 1.45 mm
Maximum impression at 20000 passes (left wheel): no data
Maximum impression at 20000 passes (right wheel): no data
Average impression at 20000 passes (left/right avg): no data
Maximum impression at 25000 passes (left wheel): no data
Maximum impression at 25000 passes (right wheel): no data
Average impression at 25000 passes (left/right avg): no data
Raw Data: excel
General comments (publicly viewable) (Max 1000 characters): Complies Target is <12.7 mm , Tested Avg of 1.45 mm
Test was verified on 10/11/2024 ✔
