Summary for Test 2024-10-07-19-2

Test performed: ASTM C1611-21

Project Information

Project IdentifiersProject ID: 1000409
DEA: 051S1604
EFIS: 0524000176
DIST-CO-RTE-PM05-MON-1-60
Award DateNot set
Closeout DateNot set
Work DescriptionRocky Creek Slip Out Permanent Restoration Project
Location DescriptionNot set
QA Service Level1 (Verified on 06/26/2024)

Sample Information

Sample Taken Date10/07/2024 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/07/2024
Sample typeQuality Control A brief description of the sample1 cubic ft. of Concrete for Testing
The quantity of what the sample constitutes1 cubic ft. of Concrete for Testing From where was the sample collectedFabricator
First name of sampler or witnessed byMark Patrick Last name of sampler or witnessed byBaddu
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameConFab Lathrop Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberVER-95LV
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected11533
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 1A at 2nd truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-10-07-19
DIME Test ID: 2024-10-07-19-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Test Release Date: 2024-10-08

Test Results


What unit system is used for measurements?: inches
Input Type: Calculated
Tester's full name: Patrick Wright
Date of test: 10/07/2024
Filling the mold procedure: Filling Procedure B (Inverted Mold)
Diameter 1: 25 in
Diameter 2: 25 in
Visual Stability Index: 0
Slump Flow: 25 in
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/8/2024