Summary for Test 2024-09-23-56-5
Test performed: CTM 551-August 2012Project Information
| Project Identifiers | Project ID: 1000080 DEA: 061F2004 EFIS: 0622000190 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-190-R32.8,R40.0 |
| Award Date | 04/05/2024 |
| Closeout Date | 01/23/2025 |
| Work Description | PLACE POLYESTER CONCRETE OVERLAY, EPOXY INJECTION, AND JOINT SEAL. |
| Location Description | TULARE COUNTY NEAR SPRINGVILLE AT NORTH FORK TULE RIVER BRIDGE AND AT NORTH FORK MIDDLE FORK TULE RIVER BRIDGE |
| QA Service Level | 1 (Verified on 01/29/2024) |
Sample Information
| Sample Taken Date | 09/23/2024 | Sample Unique Key | 56 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/24/2024 |
| Sample type | Quality Control | A brief description of the sample | 1 gallon can / PPC 1121 RESIN |
| The quantity of what the sample constitutes | 34 Totes | From where was the sample collected | Source |
| First name of sampler or witnessed by | Gilberto | Last name of sampler or witnessed by | Gonzalez |
| Title of sampler | Quality Control Manager | Telephone number of sampler | 7076245467 |
| Laboratory sample identification | 000130KBP | Linked DIME Sample ID | 000130KBP |
| The fabricator/manufacturer/facility name | Kwik Bond Polymers, Benicia | Transportation Laboratory (TL) Number | Sacramento Caltrans lab |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Polyester | Mfg. Lot Number(s) | AZ4I01450T |
|---|---|---|---|
| Batch number | AZ4I01450T | Mix number | AZ4I01450T |
Test Details
DIME Sample ID: 2024-09-23-56
DIME Test ID: 2024-09-23-56-5
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CTM 551-August 2012: Method of Test for Determining Suitability of Materials for Overlayment and Repair of Portland Cement Concrete Pavements and Structures
Test Release Date: 2024-10-04
Test Results
Input Type: Measured
Tester's full name: Gilberto Gonzalez
Date of test: 09/27/2024
Curing history for Sample 1: 24hr
Maximum applied load (P) for Sample 1: 1484 lb
Span length for Sample 1: 9 in
Break location for Sample 1: bond
Specimen defects/notes for Sample 1: no data
Surface type for Sample 1: SSD
Modulus of rupture (R) for Sample 1: 742 psi
Curing history for Sample 2: 24hr
Maximum applied load (P) for Sample 2: 1332 lb
Span length for Sample 2: 9 in
Break location for Sample 2: bond
Specimen defects/notes for Sample 2: no data
Surface type for Sample 2: SSD
Modulus of rupture (R) for Sample 2: 666 psi
Curing history for Sample 3: 24hr
Maximum applied load (P) for Sample 3: 1680 lb
Span length for Sample 3: 9 in
Break location for Sample 3: bond
Specimen defects/notes for Sample 3: no data
Surface type for Sample 3: SSD
Modulus of rupture (R) for Sample 3: 840 psi
General comments (publicly viewable) (Max 1000 characters): Accepted vendor's results.
Test was verified on 10/4/2024 ✔
