Summary for Test 2024-09-27-25-4
Test performed: CTM TEMP1-16Project Information
| Project Identifiers | Project ID: 1000078 DEA: 051P2804 EFIS: 0522000016 |
|---|---|
| DIST-CO-RTE-PM | 05-SCR,-1-17.02/17.02 |
| Award Date | 04/19/2024 |
| Closeout Date | 04/01/2025 |
| Work Description | REPLACE SEPARATION BRIDGE GIRDER. |
| Location Description | SANTA CRUZ COUNTY IN SANTA CRUZ AT ROUTE 1 NORTHBOUND/17 SEPARATION |
| QA Service Level | 1 (Verified on 02/05/2024) |
Sample Information
| Sample Taken Date | 09/27/2024 | Sample Unique Key | 25 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/30/2024 |
| Sample type | Quality Control | A brief description of the sample | T-II/V Cement |
| The quantity of what the sample constitutes | 4 CY | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Jimmy | Last name of sampler or witnessed by | Juco |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Con-Fab California, LLC - Shafter | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | SCC-S8.5-0FG |
|---|---|---|---|
| The truck number from where the sample was collected | 76 | The batch plant ticket number from where the sample was collected | 5132 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Sampled from wheelbarrow collected from chute of ready mix truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-09-27-25
DIME Test ID: 2024-09-27-25-4
Testing Lab: Con-Fab California, LLC
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2024-09-30
Test Results
Input Type: Calculated
Tester's full name: Jimmy Juco
Date of test: 09/27/2024
Precast Maximum Curing Temperature: 130 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/30/2024 ✔