Summary for Test 2024-09-20-62-1

Test performed: CTM 552-December 2013

Project Information

Project IdentifiersProject ID: 1000312
DEA: 040Y8204
EFIS: 0422000343
DIST-CO-RTE-PM04-SON-101,116,128-Var
Award Date06/26/2024
Closeout Date09/29/2025
Work DescriptionPLACE POLYESTER CONCRETE OVERLAY, TREAT BRIDGE DECK WITH METHACRYLATE.
Location DescriptionSONOMA COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 07/15/2024)

Sample Information

Sample Taken Date09/20/2024 Sample Unique Key62
Date that the sample was received by the laboratory/organization performing the testing09/20/2024 Sample typeQuality Assurance
A brief description of the sampleRelative Compaction of Polymer Concrete The quantity of what the sample constitutes133 SY
From where was the sample collectedSupplier First name of sampler or witnessed byDan
Last name of sampler or witnessed byRingler Title of samplerLab Technician
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTruesdell Corp.
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypePolyester Mfg. Lot Number(s)1
Batch Number1 Mix number1

Test Details

DIME Sample ID: 2024-09-20-62
DIME Test ID: 2024-09-20-62-1
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: CTM 552-December 2013: Method of Test for Relative Compaction of Polymer Concrete Utilizing Nuclear Gages
Test Release Date: 2024-09-30

Test Results


Input Type: Calculated
Tester's full name: Dan Ringler
Date of test: 09/30/2024
Gage No.: 685
Time of test: 20:00 HH:MM
Standard Density: 2.4 g/cc
In-Place Density: 2.47 g/cc
Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/30/2024 ✔