Summary for Test 2024-08-19-84-3
Test performed: AASHTO T51-22Project Information
| Project Identifiers | Project ID: 1000089 DEA: 024J8904 EFIS: 0223000084 |
|---|---|
| DIST-CO-RTE-PM | 02-TEH-36-6.0/R12.6 |
| Award Date | 04/04/2024 |
| Closeout Date | 01/24/2025 |
| Work Description | RHMA (GAP GRADED) OVERLAY WITH REPLACE ASPHALT CONCRETE SURFACING. |
| Location Description | TEHAMA COUNTY NEAR PLATINA FROM 3.3 MILES WEST OF VESTAL ROAD TO 2.3 MILES EAST OF DRY CREEK BRIDGE |
| QA Service Level | 1 (Verified on 03/18/2024) |
Sample Information
| Sample Taken Date | 08/19/2024 | Sample Unique Key | 84 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/16/2024 |
| Sample type | Production Start-Up | A brief description of the sample | Asphalt Binder Sample |
| The quantity of what the sample constitutes | 1 of 2 cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | Joel | Last name of sampler or witnessed by | Williams |
| Title of sampler | QC | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Pacific North West | Transportation Laboratory (TL) Number | C895206 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Pacific Northwest Oil - Stockton CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2024-08-19-84
DIME Test ID: 2024-08-19-84-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2024-09-27
Test Results
Is a normal test obtainable?: Yes
Number of replicates tested: Three
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 09/27/2024
Ductility of test #1 (D1): 35 cm
Ductility of test #2 (D2): 29 cm
Ductility of test #3 (D3): 30 cm
Ductility of sample: 31 cm
General comments (publicly viewable) (Max 1000 characters): DUCT
Test was verified on 9/27/2024 ✔
