Summary for Test 2024-08-12-43-5
Test performed: CTM 551-August 2012Project Information
| Project Identifiers | Project ID: 995534 DEA: 120T8604 EFIS: 1222000109 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-5-2.3/19.9 |
| Award Date | 03/13/2024 |
| Closeout Date | Not set |
| Work Description | APPLY METHACRYLATE AND POLYESTER CONCRETE & REPLACE JOINT SEALS. |
| Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM AVENIDA PRESIDIO UNDERCROSSING TO LAKE FOREST DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 01/26/2024) |
Sample Information
| Sample Taken Date | 08/12/2024 | Sample Unique Key | 43 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/14/2024 |
| Sample type | Quality Control | A brief description of the sample | 1 gallon can / PPC 1121 RESIN |
| The quantity of what the sample constitutes | 34 Totes | From where was the sample collected | Source |
| First name of sampler or witnessed by | Gilberto | Last name of sampler or witnessed by | Gonzalez |
| Title of sampler | Quality Control Manager | Telephone number of sampler | 7076245467 |
| Laboratory sample identification | 000110KBP | Linked DIME Sample ID | 000110KBP |
| The fabricator/manufacturer/facility name | Kwik Bond Polymers, Benicia | Transportation Laboratory (TL) Number | Sacramento Caltrans lab |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Polyester | Mfg. Lot Number(s) | AZ4H01188T |
|---|---|---|---|
| Batch number | AZ4H01188T | Mix number | AZ4H01188T |
Test Details
DIME Sample ID: 2024-08-12-43
DIME Test ID: 2024-08-12-43-5
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CTM 551-August 2012: Method of Test for Determining Suitability of Materials for Overlayment and Repair of Portland Cement Concrete Pavements and Structures
Test Release Date: 2024-09-23
Test Results
Input Type: Measured
Tester's full name: Gilberto Gonzalez
Date of test: 09/23/2024
Curing history for Sample 1: 24hr
Maximum applied load (P) for Sample 1: 1277.06 lb
Span length for Sample 1: 9 in
Break location for Sample 1: bond
Specimen defects/notes for Sample 1: no data
Surface type for Sample 1: SSD
Modulus of rupture (R) for Sample 1: 638.532 psi
Curing history for Sample 2: 24hr
Maximum applied load (P) for Sample 2: 853.99 lb
Span length for Sample 2: 9 in
Break location for Sample 2: bond
Specimen defects/notes for Sample 2: no data
Surface type for Sample 2: SSD
Modulus of rupture (R) for Sample 2: 426.995 psi
Curing history for Sample 3: 24hr
Maximum applied load (P) for Sample 3: 1216.07 lb
Span length for Sample 3: 9 in
Break location for Sample 3: bond
Specimen defects/notes for Sample 3: no data
Surface type for Sample 3: SSD
Modulus of rupture (R) for Sample 3: 608.035 psi
General comments (publicly viewable) (Max 1000 characters): Accepted Vendor's Results
Test was verified on 9/23/2024 ✔
