Summary for Test 2024-09-05-91-1
Test performed: CONCLP 4-16Project Information
| Project Identifiers | Project ID: 993360 DEA: 023J2204 EFIS: 0222000021 |
|---|---|
| DIST-CO-RTE-PM | 02-TEH,TEH/TEH,PLU/PLU,LAS/LAS,SHA/SHA,PLU,LAS,TEH,SHA-32,36,44,189,147,172-0/24.87, 43.95/104, 0/18.42, 0/6, 14.3/19.2, 19.01/71.39, 0/37.25, 8.9/42.3, 0/9.89, 0/1.8, 0/8.92, 0/4.4, 43.95/19.2, 62.69/37.25, 19.01/62.69, 0/21.72, 6/14.3, 0/247.87, 83/19.2 |
| Award Date | 08/07/2021 |
| Closeout Date | 07/27/2023 |
| Work Description | Remove hazard trees, erosion control, paving, and drainage repairs in order to restore the facility. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
| Sample Taken Date | 09/05/2024 | Sample Unique Key | 91 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/13/2024 |
| Sample type | Quality Assurance | A brief description of the sample | 1 gallon can |
| The quantity of what the sample constitutes | 1 | From where was the sample collected | Other |
| First name of sampler or witnessed by | Joel | Last name of sampler or witnessed by | Gosik |
| Title of sampler | RE | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | KBP | Transportation Laboratory (TL) Number | 636955 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Methacrylate | Mfg. Lot Number(s) | 24-30-891 |
|---|---|---|---|
| Batch number | 2430891 | Mix number | 3860 |
Test Details
DIME Sample ID: 2024-09-05-91
DIME Test ID: 2024-09-05-91-1
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CONCLP 4-16: HMWM
Test Release Date: 2024-09-23
Test Results
Input Type: Measured
Tester's full name: Mitra Rafiei
Date of test: 09/11/2024
Viscosity (ASTM D 2196) Brookfield RVT with UL adapter, 50 RPM @ 77 deg F, 25 max cps @ 77 deg F: 19.8
Specific gravity (ASTM D 1475) 0.90 min @ 77 deg F: 1.09
Volatile content (ASTM D 2369) 30% max: 19.8
Flash point (ASTM D 3828) more than 180 deg F: 210
PCC - SSD bond strength (CA Test 551) 500 psi minimum @ 24 hours: no data
Tack free time, 400 minutes max: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/23/2024 ✔
