Summary for Test 2024-09-05-47-3

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 1000251
DEA: 042Y5004
EFIS: 0423000122
DIST-CO-RTE-PM04-NAP-221-0.2/1.7
Award Date06/12/2024
Closeout Date01/09/2025
Work DescriptionCOLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G.
Location DescriptionNAPA COUNTY IN AND NEAR NAPA FROM 0.2 MILE NORTH OF JUNCTION ROUTE 12/29 TO 0.2 MILE NORTH OF BASALT ROAD UNDERCROSSING
QA Service Level1 (Verified on 06/03/2024)

Sample Information

Sample Taken Date09/05/2024 Sample Unique Key47
Date that the sample was received by the laboratory/organization performing the testing09/06/2024 Sample typeQuality Assurance
A brief description of the sample3/4"HMA+25%RAP The quantity of what the sample constitutes0-750 Tons
From where was the sample collectedSource First name of sampler or witnessed byJacob
Last name of sampler or witnessed byVega Title of samplerLab Technician
Telephone number of sampler8316826277 Laboratory sample identificationCon_24_661
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan Vallejo drier Drum Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number2 HMA Mix Number220304
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Test Details

DIME Sample ID: 2024-09-05-47
DIME Test ID: 2024-09-05-47-3
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2024-09-18

Test Results


Number of tests: 1
Is the sample lab compacted or field compacted?:
Input Type: Calculated
Tester's full name: Jacob Vega
Date of test: 09/13/2024
1

95.1 %
General comments (publicly viewable) (Max 1000 characters): Vulcan Vallejo Drier Dum Plant

Test was verified on 9/18/2024 ✔