Summary for Test 2024-09-12-11-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000165 DEA: 09392504 EFIS: 0923000029 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-R17.2/25.8 |
| Award Date | 06/26/2024 |
| Closeout Date | 12/02/2024 |
| Work Description | HOT MIX ASPHALT (TYPE A), SHOULDER BACKING, & STRIPING. |
| Location Description | INYO COUNTY ABOUT 9 MILES SOUTH OF OLANCHA FROM 0.8 MILE SOUTH OF SYKES ROAD TO 0.3 MILE NORTH OF HAIWEE CANYON ROAD |
| QA Service Level | 1 (Verified on 03/18/2024) |
Sample Information
| Sample Taken Date | 09/12/2024 | Sample Unique Key | 11 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/12/2024 |
| Sample type | Quality Assurance | A brief description of the sample | HMA5 |
| The quantity of what the sample constitutes | up to 250 tons | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jerid | Last name of sampler or witnessed by | Kupelian |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Granite Construction Arvin Plant | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | 1 | HMA Mix Number | 5 |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-09-12-11
DIME Test ID: 2024-09-12-11-2
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-09-13
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 09/13/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 4272.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 6412.0 g
Mass of HMA Sample prior to ignition: 2139.4 g
Mass Loss: 112.1 g
Mass of aggregate remaining after ignition: 2027.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.65 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.59 %
General comments (publicly viewable) (Max 1000 characters): HMA-5 3/4" Dig Out Paving
Test was verified on 9/13/2024 ✔
