Summary for Test 2024-09-06-33-4
Test performed: AASHTO T324-14Project Information
| Project Identifiers | Project ID: 994729 DEA: 034H88U4 EFIS: 0323000024 |
|---|---|
| DIST-CO-RTE-PM | 03-BUT-32-0.3/5.0 |
| Award Date | 06/30/2023 |
| Closeout Date | 04/01/2025 |
| Work Description | INSTALL LIGHTING, WIDEN SHLD, UPGRADE END TREATMENTS, EXTEND CULVERTS. |
| Location Description | BUTTE COUNTY NEAR CHICO FROM 0.3 MILE EAST OF BUTTE COUNTY LINE TO MUIR AVENUE |
| QA Service Level | 1 (Verified on 05/15/2023) |
Sample Information
| Sample Taken Date | 09/06/2024 | Sample Unique Key | 33 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/09/2024 |
| Sample type | Production Start-Up | A brief description of the sample | 6 Boxes |
| The quantity of what the sample constitutes | 3/4" RHMA-G | From where was the sample collected | Source |
| First name of sampler or witnessed by | Brad | Last name of sampler or witnessed by | McKeehan |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | Daily 24-184 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | KRC - Orland | Transportation Laboratory (TL) Number | C803812 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 1 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-09-06-33
DIME Test ID: 2024-09-06-33-4
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T324-14: Standard Method of Test for Hamburg Wheel-Track Testing of Compacted Asphalt Mixtures (Hamburg Wheel Track)
Test Release Date: 2024-09-12
Test Results
Input Type: Calculated
Tester's full name: Joshua Wilson
Date of test: 09/12/2024
Specified minimum number of passes at ½” rut depth, or number of passes at ½” rut depth average: no data
Impression at specified number of passes average: no data
Specified minimum number of passes at ½” rut depth, or number of passes at ½” rut depth if applicable (Wheel A): 25000
Specified minimum number of passes at ½” rut depth, or number of passes at ½” rut depth if applicable (Wheel B): 24980
Impression at specified number of passes, or specified maximum impression if applicable (Wheel A): 11.36 mm
Impression at specified number of passes, or specified maximum impression if applicable (Wheel B): 6.45 mm
Stripping Inflection Point (Wheel A): 25000
Stripping Inflection Point (Wheel B): 24980
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/12/2024 ✔
