Summary for Test 2024-09-06-30-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 995487 DEA: 043W7604 EFIS: 0422000033 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-37-R7.3/R8.0 |
| Award Date | 03/11/2024 |
| Closeout Date | 11/27/2024 |
| Work Description | POLYESTER CONCRETE OVERLAY. |
| Location Description | SOLANO COUNTY IN AND NEAR VALLEJO FROM 0.2 MILE EAST OF WALNUT STREET OVERCROSSING TO 0.5 MILE WEST OF SACRAMENTO STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 11/27/2023) |
Sample Information
| Sample Taken Date | 09/06/2024 | Sample Unique Key | 30 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/10/2024 | Sample type | Quality Assurance |
| A brief description of the sample | 1/2"HMA+25%RAP | The quantity of what the sample constitutes | 0-750 Tons |
| From where was the sample collected | Source | First name of sampler or witnessed by | Jacob |
| Last name of sampler or witnessed by | Vega | Title of sampler | Lab Technician |
| Telephone number of sampler | 8316826277 | Laboratory sample identification | Con_24_671 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Martin Marietta Sunol Drum Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | L230123 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-09-06-30
DIME Test ID: 2024-09-06-30-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-09-11
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Jacob Vega
Date of test: 09/09/2024
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1672.4 g
Mass Loss: 105.8 g
Correction Factor (Percent by mass of HMA Specimen): 1.26 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.89 %
General comments (publicly viewable) (Max 1000 characters): PASSED
Test was verified on 9/11/2024 ✔
