Summary for Test 2024-09-05-45-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 995379
DEA: 072XF704
EFIS: 0723000127
DIST-CO-RTE-PM07-VEN-33-44.2/57.2
Award Date03/02/2023
Closeout Date05/08/2026
Work DescriptionReconstruct slopes, place RSP, clean drainage systems
Location DescriptionNot set
QA Service Level1 (Verified on 11/27/2023)

Sample Information

Sample Taken Date09/05/2024 Sample Unique Key45
Date that the sample was received by the laboratory/organization performing the testing09/05/2024 Sample typeAcceptance
A brief description of the sampleVen-33 at postmile 44.11 The quantity of what the sample constitutes226 sy
From where was the sample collectedJob Site First name of sampler or witnessed byCaesar
Last name of sampler or witnessed byRamirez Title of samplerTRANSPORTATION ENGINEER CIVIL
Telephone number of sampler8189748391 Laboratory sample identification24-2696
Linked DIME Sample ID The fabricator/manufacturer/facility nameR&R Demo
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameVen-33 at postmile 44.11
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleEmbankment
The fabricator/manufacturer designation for the samplevarious Embankment A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite

Test Details

DIME Sample ID: 2024-09-05-45
DIME Test ID: 2024-09-05-45-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-09-18

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Caesar Ramirez
Date of test: 09/05/2024
Gage No.: 63090
Test No.: 2
Nuclear By: Caesar Ramirez
Non-Bias Plan No.: 3
Depth: 12"
Material No.: Native
Material Type: Embankment
Impact By: Caesar Ramirez
Standard Count Density: 2242 g/cc
Count or Density 1: 2.15 g/cc
Count or Density 2: 2.18 g/cc
Count or Density 3: 2.17 g/cc
Standard Count Moisture: 650 g/cc
Moisture Count 1: 0.21 g/cc
Moisture Count 2: 0.18 g/cc
Moisture Count 3: 0.2 g/cc
Sum of Count or Density: 7 g/cc
Average of Count or Density: 2 g/cc
Sum of Moisture Count: 1 g/cc
Average of Moisture Count: 0 g/cc
Count Ratio Density: 0
Count Ratio Moisture: 0
Calculated Percent Relative Compaction: 97.7 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters): Notified Inspector Nidal Branbo for the test results

Test was verified on 9/18/2024 ✔