Summary for Test 2024-08-05-89-2
Test performed: ASTM D5329-16Project Information
| Project Identifiers | Project ID: 994975 DEA: 034H0704 EFIS: 0318000158 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV-20-R12.2/20.0 |
| Award Date | 10/26/2023 |
| Closeout Date | 07/15/2025 |
| Work Description | COLD PLANE AND OVERLAY, INSTALL CURED-IN-PLACE PIPELINERS. |
| Location Description | NEVADA COUNTY IN AND NEAR GRASS VALLEY AND NEVADA CITY FROM ROUTE 20/49 SEPARATION TO 0.1 MILE EAST OF CELIO ROAD |
| QA Service Level | 1 (Verified on 08/28/2023) |
Sample Information
| Sample Taken Date | 08/05/2024 | Sample Unique Key | 89 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/30/2024 |
| Sample type | Verification | A brief description of the sample | 3/4" RHMA-G-SP, PG 64-16 |
| The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Chittenden |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 4080 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Teichert Hallwood | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | PNW |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | 3 |
| Sublot number | 7 | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2024-08-05-89
DIME Test ID: 2024-08-05-89-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2024-09-09
Test Results
Input Type: Measured
Tester's full name: Karen Sawyer
Date of test: 09/09/2024
Temperature: 25 C
Ball Penetration (P1): 1 mm
Final Dial reading (F1): 70 mm
Ball Penetration (P2): 0 mm
Final Dial reading (F2): 68 mm
Ball Penetration (P3): 0 mm
Final Dial reading (F3): 66 mm
Resilience 1: 31 %
Resilience 2: 32 %
Resilience 3: 34 %
Average Resilience: 32 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/9/2024 ✔
