Summary for Test 2024-08-01-73-3
Test performed: AASHTO T49-15Project Information
| Project Identifiers | Project ID: 55555 DEA: AMRL EFIS: AMRL |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for AASHTO Materials Reference Laboratory (AMRL). |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 08/01/2024 | Sample Unique Key | 73 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/01/2024 | Sample type | Proficiency |
| A brief description of the sample | Sample 3 (A) | The quantity of what the sample constitutes | CRS-2P/LM PSP Modified Emulsified |
| From where was the sample collected | Other | First name of sampler or witnessed by | AASHTO resource |
| Last name of sampler or witnessed by | AASHTO resource | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | AASHTO resource | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphaltic Emulsion | Emulsion Grade | CRS-2 |
|---|---|---|---|
| Lot Number | Not set | Sub Lot | Not set |
| Dilution Percentage Rate | Not set |
Test Details
DIME Sample ID: 2024-08-01-73
DIME Test ID: 2024-08-01-73-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T49-15: Standard Method of Test for Penetration of Bituminous Materials
Test Release Date: 2024-09-06
Test Results
Input Type: Calculated
Tester's full name: Glenn Bradley
Date of test: 08/27/2024
Average Penetration: 108 dmm
General comments (publicly viewable) (Max 1000 characters): Pen. of Distillation Residue
Test was verified on 9/6/2024 ✔
