Summary for Test 2024-09-03-4-4

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 993318
DEA: 11423704
EFIS: 1116000059
DIST-CO-RTE-PM11-SD-8-R31.8/R41.7
Award Date04/01/2022
Closeout Date04/08/2025
Work DescriptionPLACE CRCP, HMA, MGS, AND WATER POLLUTION CONTROL SYSTEM.
Location DescriptionSAN DIEGO COUNTY NEAR ALPINE FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE
QA Service Level1 (Verified on 10/27/2021)

Sample Information

Sample Taken Date09/03/2024 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/03/2024
Sample typeQuality Assurance A brief description of the sample1/2" HMA
The quantity of what the sample constitutes8 boxes From where was the sample collectedSource
First name of sampler or witnessed byDerrick Last name of sampler or witnessed byMcCovy
Title of sampler Telephone number of sampler
Laboratory sample identification6595-RPSU Linked DIME Sample ID
The fabricator/manufacturer/facility nameMartin Marietta Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number HMA Mix Number21217005SR MM
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Test Details

DIME Sample ID: 2024-09-03-4
DIME Test ID: 2024-09-03-4-4
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2024-09-10

Test Results


Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 09/05/2024
123
2.421 2.396 2.424
2.473

2.1 %

3.1 %

2.0 %

2.4 %
General comments (publicly viewable) (Max 1000 characters): Non Compliance - Failed Both Height and Air Void Spec

Test was verified on 9/10/2024