Summary for Test 2024-08-25-10-9
Test performed: AASHTO T30-19Project Information
| Project Identifiers | Project ID: 994903 DEA: 11430244 EFIS: 1118000033 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-125-9.3/13.0 |
| Award Date | 09/06/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA, RHMA, SLAB REPLACEMENT, AND ELECTRICAL WORK. |
| Location Description | SAN DIEGO COUNTY IN AND NEAR LEMON GROVE FROM 0.3 MILE SOUTH OF ELKELTON PLACE UNDERCROSSING TO 0.2 MILE SOUTH OF ROUTE 125/94 SEPARATION |
| QA Service Level | 1 (Verified on 11/14/2023) |
Sample Information
| Sample Taken Date | 08/25/2024 | Sample Unique Key | 10 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/26/2024 | Sample type | Quality Assurance |
| A brief description of the sample | 1/2" HMA | The quantity of what the sample constitutes | 3 bags |
| From where was the sample collected | Source | First name of sampler or witnessed by | Ben |
| Last name of sampler or witnessed by | Smith | Title of sampler | |
| Telephone number of sampler | 6193804522 | Laboratory sample identification | 0123-PSU |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Otay | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-37-0035 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1/2 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-08-25-10
DIME Test ID: 2024-08-25-10-9
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2024-09-10
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Measured
Tester's full name: Shawn Rivers
Date of test: 08/29/2024
| Cumulative Mass Retained | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 1465.0 grams | ||||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 58.0 grams | 96 % | |||||
| 191.0 grams | 87 % | |||||
| 574.0 grams | 61 % | |||||
| 832.0 grams | 43 % | |||||
| 1011.0 grams | 31 % | |||||
| 1148.0 grams | 22 % | |||||
| 1259.0 grams | 14 % | |||||
| 1327.0 grams | 9 % | |||||
| 1364.0 grams | 6.9 % | |||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/10/2024 ✔
