Summary for Test 2024-07-31-101-2
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 995085 DEA: 07322904 EFIS: 0716000059 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-27-0.0/18.6 |
| Award Date | 11/06/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING AC PAVEMENT & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET |
| QA Service Level | 1 (Verified on 09/11/2023) |
Sample Information
| Sample Taken Date | 07/31/2024 | Sample Unique Key | 101 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/31/2024 |
| Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
| The quantity of what the sample constitutes | 10 cubic yards | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Fernando | Last name of sampler or witnessed by | Carranza |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 24-2321-2322-2323-2324 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | S30C396LOA |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 252129 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | wheelbarrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-07-31-101
DIME Test ID: 2024-07-31-101-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-08-29
Test Results
Input Type: Measured
Tester's full name: Fernando Carranza
Date of test: 07/31/2024
Temperature: 82 F
General comments (publicly viewable) (Max 1000 characters): Log # 24-2321 (Fabrication)
Test was verified on 8/29/2024 ✔