Summary for Test 2024-08-12-65-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 995051 DEA: 023H6804 EFIS: 0218000006 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-5-R28.8/R44.1 |
| Award Date | 10/26/2023 |
| Closeout Date | 09/24/2025 |
| Work Description | PLACE RHMA, PAINT TRAFFIC STRIPE, & INSTALL FIBER OPTIC CABLE SYSTEM. |
| Location Description | SHASTA COUNTY ABOUT 6 MILES NORTH OF SHASTA LAKE CITY FROM PIT RIVER BRIDGE TO 1.2 MILES SOUTH OF DOG CREEK BRIDGE |
| QA Service Level | 1 (Verified on 08/14/2023) |
Sample Information
| Sample Taken Date | 08/12/2024 | Sample Unique Key | 65 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/13/2024 | Sample type | Acceptance |
| A brief description of the sample | 1 Bag RAP | The quantity of what the sample constitutes | 1 bag RAP |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Cindy |
| Last name of sampler or witnessed by | Bryant | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | D79687B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | J F Shea Construction - Fawndale Rock and Asphalt - Redding CA | |
| Transportation Laboratory (TL) Number | 851379 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Fawndale Rock and Asphalt, Reddimg, CA |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2024-08-12-65
DIME Test ID: 2024-08-12-65-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-08-21
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean Mcwithey
Date of test: 08/19/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 3027.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 4723.5 g
Mass of HMA Sample prior to ignition: 1695.9 g
Mass Loss: 106.9 g
Mass of aggregate remaining after ignition: 1589.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.12 %
General comments (publicly viewable) (Max 1000 characters): Pbr=6.13
Test was verified on 8/21/2024 ✔
