Summary for Test 2024-07-23-132-2
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 993387 DEA: 07323404 EFIS: 0716000064 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-R59.5/R67.9 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | PLACE CULVERT, REPLACE DRAINAGE SYSTEM, RECONST ROADWAY & EMBANKMENT. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY UNDERCROSSING |
QA Service Level | 1 (Verified on 12/06/2021) |
Sample Information
Sample Taken Date | 07/23/2024 | Sample Unique Key | 132 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/23/2024 |
Sample type | Quality Assurance | A brief description of the sample | A set of 3 JPCP RSC beams |
The quantity of what the sample constitutes | 10 cubic yards | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Aleksey | Last name of sampler or witnessed by | Souglobov |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 24-2137 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | G3 21 CTS 221 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-07-23-132
DIME Test ID: 2024-07-23-132-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-08-21
Test Results
Input Type: Measured
Tester's full name: Aleksey Souglobov
Date of test: 07/23/2024
Temperature: 86 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/21/2024 ✔