Summary for Test 2024-08-20-2-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215456 DEA: 07293604 EFIS: 0713000238 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-14.3/15.8 |
| Award Date | 05/26/2021 |
| Closeout Date | 07/03/2025 |
| Work Description | CONSTRUCT AUXILIARY LANE AND WIDEN ON AND OFF RAMPS. |
| Location Description | LOS ANGELES COUNTY IN TORRANCE BETWEEN WESTERN AVENUE UNDERCROSSING AND WEST 182ND STREET |
| QA Service Level | 1 (Verified on 07/07/2021) |
Sample Information
| Sample Taken Date | 08/20/2024 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/19/2024 |
| Sample type | Acceptance | A brief description of the sample | 3/4" HMA-A 105793 |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Pham |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 24-206 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | 0817B2 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 105793 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-08-20-2
DIME Test ID: 2024-08-20-2-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-08-20
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 08/20/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 4035.3 g
Mass of the specimen and specimen basket assembly prior to ignition: 6113.2 g
Mass of HMA Sample prior to ignition: 2077.9 g
Mass Loss: 101.0 g
Mass of aggregate remaining after ignition: 1976.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.34 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.52 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/20/2024 ✔
