Summary for Test 2024-08-09-61-4

Test performed: CTM TEMP1-16

Project Information

Project IdentifiersProject ID: 212470
DEA: 044A1304
EFIS: 0400001106
COOP: 042718
DIST-CO-RTE-PM04-SON-101-18.5/18.5
Award Date11/17/2023
Closeout DateNot set
Work DescriptionCONSISTS OF MODIFICATION AND RECONSTRUCTION OF THE EXISTING US 101/HEARN AVENUE INTERCHANGE IN SONOMA COUNTY, INCLUDING REPLACING THE EXISTING TWO-LANE HEARN AVENUE OVERCROSSING WITH A NEW OVERCROSSING, AND MODIFYING THE SOUTHBOUND OFF-RAMP IN CITY
Location DescriptionIN SONOMA COUNTY.
QA Service Level1 (Verified on 09/23/2019)

Sample Information

Sample Taken Date08/09/2024 Sample Unique Key61
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/09/2024
Sample typeQuality Control A brief description of the sample1 cubic ft. of Concrete for Testing
The quantity of what the sample constitutes1 cubic ft. of Concrete for Testing From where was the sample collectedFabricator
First name of sampler or witnessed byMark Patrick Last name of sampler or witnessed byBaddu
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameConFab Lathrop Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberVER-98LV
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected2973
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 1B, 5th Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-08-09-61
DIME Test ID: 2024-08-09-61-4
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2024-08-19

Test Results


Input Type: Calculated
Tester's full name: Patrick Wright
Date of test: 08/09/2024
Precast Maximum Curing Temperature: 143.5 °F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/19/2024