Summary for Test 2024-04-25-92-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994785 DEA: 023H32U4 EFIS: 0221000164 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-I5-2.5/R15.9 |
| Award Date | 04/28/2023 |
| Closeout Date | Not set |
| Work Description | Roadway rehabilitation and bridge improvements along I5 in Mount Shasta |
| Location Description | SIS I5 2.5/R15.9 |
| QA Service Level | 1 (Verified on 05/03/2023) |
Sample Information
| Sample Taken Date | 04/25/2024 | Sample Unique Key | 92 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/25/2024 |
| Sample type | Production Start-Up | A brief description of the sample | 2 bags of Combined RAP (1/2-inch) |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | D. | Last name of sampler or witnessed by | Owen |
| Title of sampler | PEI | Telephone number of sampler | |
| Laboratory sample identification | D79483 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Tullis — Northstate Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 858487 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Northstate Asphalt |
|---|---|---|---|
| Aggregate Size | 1/2-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2024-04-25-92
DIME Test ID: 2024-04-25-92-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-08-13
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 05/01/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 3015.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4863.2 g
Mass of HMA Sample prior to ignition: 1847.7 g
Mass Loss: 102.4 g
Mass of aggregate remaining after ignition: 1745.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.16 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.38 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=5.38%
Test was verified on 8/13/2024 ✔
