Summary for Test 2024-06-28-99-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
---|---|
DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
Award Date | 04/12/2023 |
Closeout Date | Not set |
Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
Sample Taken Date | 06/28/2024 | Sample Unique Key | 99 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/28/2024 |
Sample type | Quality Assurance | A brief description of the sample | Native Material |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Dominic | Last name of sampler or witnessed by | Montemayor |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 24-1674 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-06-28-99
DIME Test ID: 2024-06-28-99-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-08-09
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 06/28/2024
Gage No.: no data
Test No.: no data
Nuclear By: no data
Non-Bias Plan No.: no data
Depth: no data
Material No.: no data
Material Type: no data
Impact By: no data
Standard Count Density: 10848 g/cc
Count or Density 1: 15641 g/cc
Count or Density 2: 14855 g/cc
Count or Density 3: 15441 g/cc
Standard Count Moisture: 19656 g/cc
Moisture Count 1: 5418 g/cc
Moisture Count 2: 5602 g/cc
Moisture Count 3: 3556 g/cc
Sum of Count or Density: 45937 g/cc
Average of Count or Density: 15312 g/cc
Sum of Moisture Count: 14576 g/cc
Average of Moisture Count: 4859 g/cc
Count Ratio Density: 1.41
Count Ratio Moisture: 0.25
Calculated Percent Relative Compaction: 92.5 %
Reported Percent Relative Compaction: 93 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/9/2024 ✔