Summary for Test 2024-07-01-100-3
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 993825 DEA: 040Q30U4 EFIS: 0420000235 COOP: 042830A3,042830A4 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA,CC-680-R11.0/R21.9,R0.0/R0.9 |
| Award Date | 11/23/2022 |
| Closeout Date | Not set |
| Work Description | PRECAST CONC PVMT, ELECTRONIC TOLL SYSTEM, JPCP, CB & STRUCTURAL CONC |
| Location Description | ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON BETWEEN 0.4 MILE SOUTH OF CALAVERAS ROAD UNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Sample Information
| Sample Taken Date | 07/01/2024 | Sample Unique Key | 100 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/02/2024 |
| Sample type | Quality Control | A brief description of the sample | 3/4", WCS |
| The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Justin | Last name of sampler or witnessed by | Reynolds |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Mix D20119EA, Set 1 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Central Concrete Supply - Pleasanton | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-01-0010 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Set 1 | The fabricator/manufacturer designation for the sample | Unknown |
| The plant number | Unknown | A detailed description of where the material sample was collected | Belt Cut |
| Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | D20119EA | Lot number | 1 |
| Sublot number | 1 | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-07-01-100
DIME Test ID: 2024-07-01-100-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-08-08
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Valentin Gonzalez
Date of test: 07/02/2024
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 0
Sand reading (test 1): 0
Sand equivalent (test 1): 81
Sand equivalent before temperature correction: 81
Sand equivalent after temperature correction: 81
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/8/2024 ✔
