Summary for Test 2024-06-18-143-2
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
| Sample Taken Date | 06/18/2024 | Sample Unique Key | 143 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/18/2024 |
| Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
| The quantity of what the sample constitutes | 10 cubic yards | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Fernando | Last name of sampler or witnessed by | Carranza |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | 24-1548-1549 | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | SCI-12622-1 650PSI |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 92 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | wheelbarrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-06-18-143
DIME Test ID: 2024-06-18-143-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-08-07
Test Results
Input Type: Measured
Tester's full name: Aleksey Souglobov
Date of test: 06/18/2024
Temperature: 92 F
General comments (publicly viewable) (Max 1000 characters): Log # - 24-1548
Test was verified on 8/7/2024 ✔
