Summary for Test 2017-04-05-13-4

Test performed: ASTM C138-17a

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date04/05/2017 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing04/06/2017 Sample typeQuality Control
A brief description of the sample6x12 Cylinders The quantity of what the sample constitutes6
From where was the sample collectedJob Site First name of sampler or witnessed byAndrew
Last name of sampler or witnessed bySmith Title of samplerQC Field Technician
Telephone number of samplerUnknown Laboratory sample identificationSet 1
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameJobsite
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierUnknown Structure nameUnknown
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberHRC14058
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedValley View Bridge Abut 1 CIDH Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2017-04-05-13
DIME Test ID: 2017-04-05-13-4
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: ASTM C138-17a: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2017-07-18

Test Results


Input Type: Calculated
Tester's full name: Andrew Smith
Date of test: 04/05/2017
Identification of concrete represented by the sample: CIDH Pile 21
Volume of the measure: 0.500 ft^3
Density of concrete: 148.2 lb/ft^3
Yield of concrete: no data
Relative yield of the batch: no data
Cement content: no data
Air content: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/18/2017