Summary for Test 2024-07-26-9-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 994190 DEA: 07341604 EFIS: 0717000194 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-118-13.3/15.6 |
| Award Date | 10/25/2022 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT NEW MODULAR OFFICE FACILITY. |
| Location Description | VENTURA COUNTY IN AND NEAR MOORPARK FROM 0.1 MILE EAST OF BALCOM CANYON ROAD TO 0.1 MILE WEST OF MONTAIR DRIVE |
| QA Service Level | 1 (Verified on 09/20/2022) |
Sample Information
| Sample Taken Date | 07/26/2024 | Sample Unique Key | 9 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/26/2024 |
| Sample type | Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 2364 SF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michelangelo | Last name of sampler or witnessed by | Sese |
| Title of sampler | TET | Telephone number of sampler | 310-345-6204 |
| Laboratory sample identification | 24-2209 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Subgrade |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Various locations | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2024-07-26-9
DIME Test ID: 2024-07-26-9-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-07-26
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Michelangelo Sese
Date of test: 07/26/2024
Gage No.: 30936
Test No.: no data
Nuclear By: Michelangelo Sese
Non-Bias Plan No.: 6
Depth: 12
Material No.: no data
Material Type: Subgrade
Impact By: Michelangelo Sese
Standard Count Density: 1841 g/cc
Count or Density 1: 1.86 g/cc
Count or Density 2: 1.9 g/cc
Count or Density 3: 1.88 g/cc
Standard Count Moisture: 553 g/cc
Moisture Count 1: 0.13 g/cc
Moisture Count 2: 0.08 g/cc
Moisture Count 3: 0.08 g/cc
Sum of Count or Density: 5.64 g/cc
Average of Count or Density: 1.88 g/cc
Sum of Moisture Count: 0.29 g/cc
Average of Moisture Count: 0.1 g/cc
Calculated Percent Relative Compaction: 90 %
Reported Percent Relative Compaction: 90 %
General comments (publicly viewable) (Max 1000 characters): VEN WB Rte. 118
Sta. 801+92 to Sta. 803+89
Test was verified on 7/26/2024 ✔
