Summary for Test 2017-06-29-22-7

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 209141
DEA: 07215954
EFIS: 0700001835
DIST-CO-RTE-PM07-LA-5-0.0/7.6
Award Date04/24/2014
Closeout Date07/14/2022
Work DescriptionWIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location DescriptionLOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
QA Service Level1 (Verified on 06/02/2014)

Sample Information

Sample Taken Date06/29/2017 Sample Unique Key22
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/14/2017
Sample typeQuality Assurance A brief description of the sampleBarsplice Griptwist coupler, Zap screwlok type 2 CPLR
The quantity of what the sample constitutes12 From where was the sample collectedJob Site
First name of sampler or witnessed byJ Last name of sampler or witnessed byDelira
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameBarSplice Gerdau Transportation Laboratory (TL) NumberC526284 C526283
Inspector Lot Number from the Transportation Laboratory (TL) FormNA Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler ManufacturerBarSplice Intermediate Assembler or FabricatorUnknown
Rebar Size#11 Coupler ModelGrip Twist Zap Screwlok Couplers
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)A165149, A171480, A170529, A171696 Rebar Heat Number(s)65026295
Rebar Size 2 Not set Coupler Unique IDNot set

Test Details

DIME Sample ID: 2017-06-29-22
DIME Test ID: 2017-06-29-22-7
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2017-07-25

Test Results


Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 07/18/2017
UTM: 2000KIP
Halo ID: Big
Temperature: 72 F
NumSampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
113 zap#11/36mm1.560.002514220891159Service SpliceFred

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point File
Test graph for the Sample

Test was verified on 7/18/2017