Summary for Test 2024-06-28-84-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215456
DEA: 07293604
EFIS: 0713000238
DIST-CO-RTE-PM07-LA-405-14.3/15.8
Award Date05/26/2021
Closeout Date07/03/2025
Work DescriptionCONSTRUCT AUXILIARY LANE AND WIDEN ON AND OFF RAMPS.
Location DescriptionLOS ANGELES COUNTY IN TORRANCE BETWEEN WESTERN AVENUE UNDERCROSSING AND WEST 182ND STREET
QA Service Level1 (Verified on 07/07/2021)

Sample Information

Sample Taken Date06/28/2024 Sample Unique Key84
Date that the sample was received by the laboratory/organization performing the testing07/01/2024 Sample typeAcceptance
A brief description of the sampleLean Concrete Base The quantity of what the sample constitutes150 cy
From where was the sample collectedManufacturer First name of sampler or witnessed byvictor
Last name of sampler or witnessed byPham Title of sampler
Telephone number of sampler2137924794 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCEMEX - Inglewood
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site) 91-36-0106, 91-19-0023
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the samplemix 1505437
The plant numberInglewood A detailed description of where the material sample was collectedStockpile @ Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design numberLCB 1505437 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-06-28-84
DIME Test ID: 2024-06-28-84-3
Testing Lab: CT D07 - Plant Services, Unit 1841
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-08-06

Test Results


Number of tests: 2
Input Type: Measured
Tester's full name: Victor Pham
Date of test: 07/01/2024
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.7
Sand reading (test 1): 4
Clay reading (test 2): 4.8
Sand reading (test 2): 4
Sand equivalent (test 1): 86
Sand equivalent (test 2): 84
Sand equivalent before temperature correction: 85
Sand equivalent after temperature correction: 85
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/6/2024 ✔