Summary for Test 2024-06-21-76-3
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215676 DEA: 020J6404 EFIS: 0219000145 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-36-R13.6/R14.2 |
| Award Date | 12/19/2023 |
| Closeout Date | 09/24/2025 |
| Work Description | A13 AT ROUTE 36 SAFETY |
| Location Description | IN PLUMAS COUNTY NEAR CHESTER FROM 0.2 MILE WEST OF BAILEY CREEK BRIDGE TO 0.3 MILE EAST OF COUNTY ROAD A-13. |
| QA Service Level | 1 (Verified on 07/08/2021) |
Sample Information
| Sample Taken Date | 06/21/2024 | Sample Unique Key | 76 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/03/2024 |
| Sample type | Acceptance | A brief description of the sample | 1 bag of RAP |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Monte | Last name of sampler or witnessed by | Spencer |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | D79628B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Knife River Construction - Orland Plant | Transportation Laboratory (TL) Number | 692866 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | KRC Orland |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2024-06-21-76
DIME Test ID: 2024-06-21-76-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-07-18
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean Mcwithey
Date of test: 07/16/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 3062.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4691.9 g
Mass of HMA Sample prior to ignition: 1629.4 g
Mass Loss: 109.1 g
Mass of aggregate remaining after ignition: 1520.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.52 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=6.51%
Test was verified on 7/18/2024 ✔
