Summary for Test 2024-07-01-43-7

Test performed: AASHTO T301-22

Project Information

Project IdentifiersProject ID: 55556
DEA: OCR
EFIS: OCR
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for Oregon Corp. Research.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date07/01/2024 Sample Unique Key43
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/10/2024
Sample typeProficiency A brief description of the sample#350
The quantity of what the sample constitutes1 CAN, PG 58-22 From where was the sample collectedManufacturer
First name of sampler or witnessed byWAYNE Last name of sampler or witnessed byBROWN
Title of samplerODOT PETRO CREW LEADER Telephone number of sampler503-986-3074
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAlbina Asphalt Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-22
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierOregon Coop MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2024-07-01-43
DIME Test ID: 2024-07-01-43-7
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2024-07-22

Test Results


Input Type: Measured
Tester's full name: Raul Cardenas
Date of test: 07/17/2024
Final Reading from the testing machine (X): 3.0 cm
% Elongation Recovery: 85 %
General comments (publicly viewable) (Max 1000 characters): ER

Test was verified on 7/22/2024