Summary for Test 2024-07-11-2-3
Test performed: CTM 301-March 2000Project Information
| Project Identifiers | Project ID: 994330 DEA: 09366404 EFIS: 0916000006 |
|---|---|
| DIST-CO-RTE-PM | 09-MNO-395-58.2/60.4 |
| Award Date | 04/03/2023 |
| Closeout Date | 07/23/2025 |
| Work Description | HOT MIX ASPHALT (TYPE A), IMPORTED BORROW, AND ROADWAY EXCAVATION. |
| Location Description | MONO COUNTY ABOUT 6 MILES NORTH OF LEE VINING FROM ROUTE 167 TO 0.4 MILE NORTH OF CONWAY RANCH ROAD |
| QA Service Level | 1 (Verified on 07/31/2023) |
Sample Information
| Sample Taken Date | 07/11/2024 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/11/2024 |
| Sample type | Acceptance | A brief description of the sample | Class 2 AB |
| The quantity of what the sample constitutes | 2 bags of aggregate | From where was the sample collected | Source |
| First name of sampler or witnessed by | Jeffery | Last name of sampler or witnessed by | Puente |
| Title of sampler | QA | Telephone number of sampler | |
| Laboratory sample identification | AB-01 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Granite Lee Vining | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Hwy 395 / Conway Ranch | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Granite Lee Vining |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile at the Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-07-11-2
DIME Test ID: 2024-07-11-2-3
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2024-07-16
Test Results
How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 07/16/2024
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 97 %
As Received Gradation, Percent Passing 1/2 in. sieve: 84 %
As Received Gradation, Percent Passing 3/8 in. sieve: 68 %
As Received Gradation, Percent Passing #4 sieve: 53 %
As Received Gradation, Percent Passing #8 sieve: 38 %
As Received Gradation, Percent Passing #16 sieve: 29 %
As Received Gradation, Percent Passing #30 sieve: 21 %
As Received Gradation, Percent Passing #50 sieve: 15 %
As Received Gradation, Percent Passing #100 sieve: 11 %
As Received Gradation, Percent Passing #200 sieve: 7 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 86 %
As Used Gradation, Percent Passing 3/8 in. sieve: 69 %
As Used Gradation, Percent Passing #4 sieve: 54 %
As Used Gradation, Percent Passing #8 sieve: 39 %
As Used Gradation, Percent Passing #16 sieve: 29 %
As Used Gradation, Percent Passing #30 sieve: 21 %
As Used Gradation, Percent Passing #50 sieve: 15 %
As Used Gradation, Percent Passing #100 sieve: 11 %
As Used Gradation, Percent Passing #200 sieve: 7.1 %
R value: 84
General comments (publicly viewable) (Max 1000 characters): AB-01
Test was verified on 7/16/2024 ✔