Summary for Test 2024-07-11-45-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000063 DEA: 061F8804 EFIS: 0623000106 |
|---|---|
| DIST-CO-RTE-PM | 06-KIN-41-R39.9/R48.3 |
| Award Date | 04/03/2024 |
| Closeout Date | 04/11/2025 |
| Work Description | COLD PLANE, HMA PAVING, AND INDIVIDUAL CONCRETE SLAB REPLACEMENT. |
| Location Description | KINGS COUNTY AT AND NEAR LEMOORE FROM ROUTE 41/198 SEPARATION TO FRESNO COUNTY LINE |
| QA Service Level | 1 (Verified on 01/29/2024) |
Sample Information
| Sample Taken Date | 07/11/2024 | Sample Unique Key | 45 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/11/2024 |
| Sample type | Acceptance | A brief description of the sample | 3/4 HMA-SP Type A |
| The quantity of what the sample constitutes | 234 Tons | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jonathon | Last name of sampler or witnessed by | Chaney |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | SPM-Avenal | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 12 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-07-11-45
DIME Test ID: 2024-07-11-45-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-07-15
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Tomas Silva
Date of test: 07/12/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 2899.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 5048.7 g
Mass of HMA Sample prior to ignition: 2149.0 g
Mass Loss: 131.9 g
Mass of aggregate remaining after ignition: 2017.1 g
Correction Factor (Percent by mass of HMA Specimen): 0.93 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 5.07 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/15/2024 ✔
