Summary for Test 2024-05-28-1-6
Test performed: CTM 523-May 2020Project Information
| Project Identifiers | Project ID: 994872 DEA: 060X1604 EFIS: 0618000183 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-58-R64.4/67.3 |
| Award Date | 08/29/2023 |
| Closeout Date | 05/09/2025 |
| Work Description | HMA (TYPE A), RHMA-G, JPCP, CRCP & HIGH SPEED WEIGH-IN-MOTION SYSTEM. |
| Location Description | KERN COUNTY NEAR EDISON FROM 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING TO CALIENTE CREEK BRIDGE |
| QA Service Level | 1 (Verified on 06/14/2023) |
Sample Information
| Sample Taken Date | 05/28/2024 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/28/2024 |
| Sample type | Department Acceptance | A brief description of the sample | JPCP |
| The quantity of what the sample constitutes | 30 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Neale | Last name of sampler or witnessed by | Brown |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Holiday Rock - Bakersfield | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 3FSH001 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 3 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Back of truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-05-28-1
DIME Test ID: 2024-05-28-1-6
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 523-May 2020: Method of Test for Flexural Strength of Concrete
Test Release Date: 2024-07-12
Test Results
Number of specimens: 3
Unit system used?: US Units
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Is a beam dimensional correction factor used?: No
Input Type: Measured
Tester's full name: Neale Brown
Date of test: 07/09/2024
Identification number: 4
Width of specimen: 6.0 inch
Width of specimen 2: 6.0 inch
Width of specimen 3: 6.0 inch
Depth of specimen: 6.1 inch
Depth of specimen 2: 6.2 inch
Depth of specimen 3: 6.1 inch
Span length of specimen: 18 inch
Span length of specimen 2: 18 inch
Span length of specimen 3: 18 inch
Maximum load applied: 8680 lb
Maximum load applied 2: 9490 lb
Maximum load applied 3: 8860 lb
Curing history and apparent moisture condition of the specimen: 0
If specimen was capped, ground or if leather shims were used: 0
Defects in specimen: 0
Age of specimen: 42 days
Age of specimen in hours: 0 hours
Modulus of rupture: 700 psi
Modulus of rupture 2: 755 psi
Modulus of rupture 3: 720 psi
Modulus of rupture average: 725 psi
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-0X1604_37000_240528_20_42D | 108.56 KB | 07/12/2024 | 2024-05-28-1-6 | Info |
Test was verified on 7/12/2024 ✔