Summary for Test 2024-05-29-101-1

Test performed: CTM 557-June 2020

Project Information

Project IdentifiersProject ID: 214649
DEA: 07316004
EFIS: 0715000194
DIST-CO-RTE-PM07-LA-14-60.70
Award Date02/07/2023
Closeout DateNot set
Work DescriptionREHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES.
Location DescriptionROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE.
QA Service Level1 (Verified on 01/29/2020)

Sample Information

Sample Taken Date05/29/2024 Sample Unique Key101
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/30/2024
Sample typeQuality Assurance A brief description of the sample6 x 12 LCB Cylinders
The quantity of what the sample constitutes10 cy From where was the sample collectedJob Site
First name of sampler or witnessed byDominic Last name of sampler or witnessed byMontemayor
Title of sampler Telephone number of sampler
Laboratory sample identification24-1195 Linked DIME Sample ID
The fabricator/manufacturer/facility nameN/A Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number12622-LCB-1
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected105
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-05-29-101
DIME Test ID: 2024-05-29-101-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-07-12

Test Results


Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 05/29/2024
Temperature: 70 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/12/2024