Summary for Test 2024-06-03-93-3
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 215348 DEA: 060U4204 EFIS: 0616000004 |
---|---|
DIST-CO-RTE-PM | 06-FRE-99-R4.9/11.6 |
Award Date | 02/25/2021 |
Closeout Date | Not set |
Work Description | CONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION. |
Location Description | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 12/07/2020) |
Sample Information
Sample Taken Date | 06/03/2024 | Sample Unique Key | 93 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/04/2024 |
Sample type | Quality Control | A brief description of the sample | 4X8 Concrete Cylinders |
The quantity of what the sample constitutes | 5 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Al | Last name of sampler or witnessed by | Pineda |
Title of sampler | QC Field Technician | Telephone number of sampler | |
Laboratory sample identification | Mix G3-22-BAR-318, Set 1 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Security Paving Company | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | G3-22-BAR-318 |
---|---|---|---|
The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 1 |
A detailed description of where the material sample was collected | Barrier Wall STA 93+80 | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2024-06-03-93
DIME Test ID: 2024-06-03-93-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-07-10
Test Results
Input Type: Calculated
Tester's full name: Al Pineda
Date of test: 06/03/2024
Temperature: 85 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/10/2024 ✔