Summary for Test 2024-06-24-62-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 994859
DEA: 021H5904
EFIS: 0216000025
DIST-CO-RTE-PM02-SIS-96-43.5,57.0
Award Date08/07/2023
Closeout DateNot set
Work DescriptionREPLACE CULVERTS WITH BRIDGES, STREAMBED RESTORATION, & LANDSCAPING.
Location DescriptionSISKIYOU COUNTY AT AND NEAR HAPPY CAMP AT 0.8 MILE WEST OF GORDON\\\\'S FERRY ROAD AND AT PORTUGUESE CREEK
QA Service Level1 (Verified on 08/10/2023)

Sample Information

Sample Taken Date06/24/2024 Sample Unique Key62
Date that the sample was received by the laboratory/organization performing the testing06/26/2024 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes25
From where was the sample collectedManufacturer First name of sampler or witnessed byNA
Last name of sampler or witnessed byNA Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDynamic Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)CR55-001-C
Material/Compound/Elastomer IDNA Samples Representing25
Description (size)1.15" x 12" x 18" Comments
Description (Number of Shims)2 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Dynamic Rubber
Batch Number296

Test Details

DIME Sample ID: 2024-06-24-62
DIME Test ID: 2024-06-24-62-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2024-07-09

Test Results


Input Type: Measured
Tester's full name: Richard Wilmshurst
Date of test: 07/09/2024
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/9/2024 ✔