Summary for Test 2024-03-06-41-5
Test performed: CTM 202-November 2011
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
Project Identifiers | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 |
---|---|
DIST-CO-RTE-PM | 07-LA-I-5-45.4/54 |
Award Date | 07/01/2021 |
Closeout Date | Not set |
Work Description | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley |
Location Description | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. |
QA Service Level | 2 (Verified on 02/03/2021) |
Sample Information
Sample Taken Date | 03/06/2024 | Sample Unique Key | 41 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/06/2024 |
Sample type | Quality Control | A brief description of the sample | 1x4 concrete aggregates |
The quantity of what the sample constitutes | 1 per batch | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Alphonso | Last name of sampler or witnessed by | Morris |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | National Ready Mix - Santa Clarita | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0046 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | stockpile or belt cut | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-03-06-41
DIME Test ID: 2024-03-06-41-5
Testing Lab: Sequoia Consultants
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2024-07-05
Test Results
What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Hector De La Torre
Date of test: 03/05/2024
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 98 %
Cumulative percent passing the #8 sieve: 82 %
Cumulative percent passing the #16 sieve: 62 %
Cumulative percent passing the #30 sieve: 39 %
Cumulative percent passing the #50 sieve: 14 %
Cumulative percent passing the #100 sieve: 4 %
Cumulative percent passing the #200 sieve: 2.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/5/2024 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.