Summary for Test 2024-06-29-5-2

Test performed: ASTM C138-17a

Project Information

Project IdentifiersProject ID: 1000310
DEA: 041X5804
EFIS: 0424000402
DIST-CO-RTE-PM04-SON-116-19.9
Award DateNot set
Closeout DateNot set
Work DescriptionRemove 12" AC overlay on the Jones Creek Bridge and Install precast pre-stressed slab girder.
Location DescriptionJones Creek Bridge (Bridge # 20-0094) in Sonoma 116 post mile 19.9
QA Service Level1 (Verified on 05/14/2024)

Sample Information

Sample Taken Date06/29/2024 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing07/05/2024 Sample typeQuality Assurance
A brief description of the sampleRSC The quantity of what the sample constitutes2.61
From where was the sample collectedJob Site First name of sampler or witnessed byJose
Last name of sampler or witnessed byCalderon Title of sampler
Telephone number of sampler9164252912 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namePrecision Concrete
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameJones Bridge
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number80371TP
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected945
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-06-29-5
DIME Test ID: 2024-06-29-5-2
Testing Lab: CT SC - 3672 - Santa Rosa
Test Method: ASTM C138-17a: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2024-08-05

Test Results


Input Type: Measured
Tester's full name: Jose Calderon Mares
Date of test: 06/29/2024
Identification of concrete represented by the sample: Slabs
Mass of the measure: 6.70 lb
Mass of the concrete and measure: 44.1 lb
Volume of concrete which the batch was designed to produce: no data yd^3
Mass of cement in the batch: no data lb
Theoretical density of the concrete: no data lb/ft^3
Total mass of all materials batched: no data lb
Volume of the measure: 0.262 ft^3
Mass of the concrete: 37.40 lb
Density of concrete: 142.7 lb/ft^3
Yield of concrete: no data
Relative yield of the batch: no data
Cement content: no data
Air content: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/5/2024 ✔