Summary for Test 2024-06-20-114-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 995124 DEA: 060X3004 EFIS: 0618000051 |
---|---|
DIST-CO-RTE-PM | 06-FRE-33-69.4/71.5 |
Award Date | 02/06/2024 |
Closeout Date | Not set |
Work Description | REPLACE ROADWAY PAVEMENT. |
Location Description | FRESNO COUNTY IN AND NEAR FIREBAUGH FROM MORRIS KYLE DRIVE TO LYON AVENUE |
QA Service Level | 1 (Verified on 10/25/2023) |
Sample Information
Sample Taken Date | 06/20/2024 | Sample Unique Key | 114 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/20/2024 |
Sample type | Acceptance | A brief description of the sample | 3/4" Recycled class 2 AB |
The quantity of what the sample constitutes | 0-1000 Tons | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jonathon | Last name of sampler or witnessed by | Chaney |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Bay Cities | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Jobsite material |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | STA 197+50 | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-06-20-114
DIME Test ID: 2024-06-20-114-2
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-06-27
Test Results
Number of tests: 1
Input Type: Measured
Tester's full name: Tomas Silva
Date of test: 06/26/2024
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 8.9
Sand reading (test 1): 3.7
Sand equivalent (test 1): 42
Sand equivalent before temperature correction: 42
Sand equivalent after temperature correction: 42
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/27/2024 ✔