Summary for Test 2024-06-25-2-2
Test performed: AASHTO T176-08Project Information
| Project Identifiers | Project ID: 994657 DEA: 09382104 EFIS: 0919000035 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-168-17.5/17.8 |
| Award Date | 01/25/2024 |
| Closeout Date | 08/29/2024 |
| Work Description | PLACE HMA AND CONSTRUCT CONCRETE CURB RAMPS AND SIDEWALK. |
| Location Description | INYO COUNTY IN AND NEAR BISHOP FROM 0.1 MILE WEST OF PIONEER LANE TO SUNLAND DRIVE |
| QA Service Level | 1 (Verified on 08/15/2023) |
Sample Information
| Sample Taken Date | 06/25/2024 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/25/2024 |
| Sample type | Acceptance | A brief description of the sample | Class II Base |
| The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
| First name of sampler or witnessed by | Josh | Last name of sampler or witnessed by | Hubartt |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | CIIB 10 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Granite 5 Bridges RD Bishop | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Granite 5 Bridges Pit |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Class II Base | The fabricator/manufacturer designation for the sample | |
| The plant number | A detailed description of where the material sample was collected | stock pile at pit | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-06-25-2
DIME Test ID: 2024-06-25-2-2
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2024-06-26
Test Results
How many times will the test be run?: Once
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 06/26/2024
Clay reading: 7.3
Sand reading: 3.9
Sand Equivalent: 54
General comments (publicly viewable) (Max 1000 characters): AB-10
Test was verified on 6/26/2024 ✔
