Summary for Test 2024-05-29-80-1

Test performed: CTM 552-December 2013

Project Information

Project IdentifiersProject ID: 994767
DEA: 043Q5304
EFIS: 0419000221
DIST-CO-RTE-PM04-CC-4,242,680-VAR
Award Date06/27/2023
Closeout Date01/09/2025
Work DescriptionPOLYESTER CONCRETE OVERLAY, GRIND BRIDGE DECK, & REPLACE JOINT SEALS.
Location DescriptionCONTRA COSTA COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 05/10/2023)

Sample Information

Sample Taken Date05/29/2024 Sample Unique Key80
Date that the sample was received by the laboratory/organization performing the testing05/29/2024 Sample typeQuality Assurance
A brief description of the samplepolyester relative density The quantity of what the sample constitutes67 SYD
From where was the sample collectedJob Site First name of sampler or witnessed byNick
Last name of sampler or witnessed byHall Title of samplerLab Technician
Telephone number of sampler7072999133 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMeyers and sons
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypePolyester Mfg. Lot Number(s)1
Batch Number1 Mix number1

Test Details

DIME Sample ID: 2024-05-29-80
DIME Test ID: 2024-05-29-80-1
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: CTM 552-December 2013: Method of Test for Relative Compaction of Polymer Concrete Utilizing Nuclear Gages
Test Release Date: 2024-06-25

Test Results


Input Type: Calculated
Tester's full name: Nicholas Hall
Date of test: 05/29/2024
Gage No.: 685
Time of test: 23:00 HH:MM
Standard Density: 0.97 g/cc
In-Place Density: 0.96 g/cc
Percent Relative Compaction: 99 %
General comments (publicly viewable) (Max 1000 characters): the densities are an average of 3

Test was verified on 6/25/2024 ✔