Summary for Test 2024-06-13-6-3
Test performed: CTM 229-June 2011Project Information
| Project Identifiers | Project ID: 994657 DEA: 09382104 EFIS: 0919000035 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-168-17.5/17.8 |
| Award Date | 01/25/2024 |
| Closeout Date | 08/29/2024 |
| Work Description | PLACE HMA AND CONSTRUCT CONCRETE CURB RAMPS AND SIDEWALK. |
| Location Description | INYO COUNTY IN AND NEAR BISHOP FROM 0.1 MILE WEST OF PIONEER LANE TO SUNLAND DRIVE |
| QA Service Level | 1 (Verified on 08/15/2023) |
Sample Information
| Sample Taken Date | 06/13/2024 | Sample Unique Key | 6 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/13/2024 | Sample type | Acceptance |
| A brief description of the sample | Class II Base | The quantity of what the sample constitutes | 1 bag |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Josh |
| Last name of sampler or witnessed by | Hubartt | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | CIIB 5 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Granite 5 Bridges Plant Bishop | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Granite 5 Bridges Road Plant |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile on jobsite | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-06-13-6
DIME Test ID: 2024-06-13-6-3
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 229-June 2011: Method of Test for Durability Index
Test Release Date: 2024-06-20
Test Results
What test(s) are being run?: Coarse durability only
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 06/18/2024
Coarse durability index: 93
General comments (publicly viewable) (Max 1000 characters): AB-05
Test was verified on 6/20/2024 ✔
