Summary for Test 2023-06-27-4-17

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 213918
DEA: 063HT014
EFIS: 0615000116
DIST-CO-RTE-PM06---
Award DateNot set
Closeout DateNot set
Work Description(Alternative Delivery)
Location DescriptionNot set
QA Service Level2 (Verified on 02/04/2019)

Sample Information

Sample Taken Date06/27/2023 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing06/27/2023 Sample typeDepartment Acceptance
A brief description of the sampleBRIDGE The quantity of what the sample constitutesBRIDGE
From where was the sample collectedJob Site First name of sampler or witnessed byHARISH
Last name of sampler or witnessed byThakur Title of sampler
Telephone number of sampler9152961873 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJOB SITE
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameDAVIS AVE OC
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Test Details

DIME Sample ID: 2023-06-27-4
DIME Test ID: 2023-06-27-4-17
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2024-06-19

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 06/17/2024
Air Temperature: 67
Tire Pressure: 24
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF EDGE
Reference Distance 1: 100
Reference Distance 2: 103
Reference Distance 3: 106
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 9
Position for Stationing 2: 9
Position for Stationing 3: 9
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.38
Corrected Coefficients of Friction for Stationing 2: 0.32
Corrected Coefficients of Friction for Stationing 3: 0.36
Average Coefficient of Friction: 0.35
General comments (publicly viewable) (Max 1000 characters): MOUNTAIN VIEW AVE BR#42C0722 EB

Test was verified on 6/19/2024 ✔